Chevallum Road
View Full WidthOur Civil Engineering and Landscape Architecture teams have partnered with Spring Projects to deliver six development-ready industrial lots with Bruce Highway exposure, adding much-needed industrial land supply to a tightly held Sunshine Coast market.
Our Civil Engineering team were engaged by local Brisbane developer, Spring Projects, to deliver the engineering design for the subdivision of 595 Chevallum Road. This entailed subdivision into six industrial lots including roadworks, earthworks, stormwater drainage and pavement design. Positioned within a strategic Sunshine Coast growth corridor, the site benefits from strong Bruce Highway visibility and north and south-bound access and egress, creating a rare industrial land opportunity for future business investment.
Through construction, our local South East Queensland team provided site inspections and coordinated closely with the contractor and Sunshine Coast Council. Geotechnical and groundwater conditions across the site presented a key challenge, and our team developed practical solutions for unsuitable subgrade, seepage, subsoil drainage and pavement construction while maintaining the intent of the approved design.
These solutions included the strategic respreading of surplus topsoil to minimise off-site disposal, along with low-flow drainage systems and additional catch drains to better manage stormwater and groundwater seepage across the site. Concrete batter treatments and safety guardrails were also incorporated in areas of elevated erosion risk, while drainage along the Chevallum Road widening was refined to protect pavement performance, improve long-term infrastructure resilience and maintain site safety and stability.
We then prepared and lodged the development application, seeking a preliminary approval for the whole site, with a variation request to establish residential and neighbourhood centre zoning, alongside a reconfiguring a lot approval for a 113-lot residential subdivision across Stages 1 and 2.
We have guided the application through assessment, coordinating responses to Council and State information requests, managing public notification and addressing the key issues raised in submissions. Ongoing communication with Council and the State has been critical in positioning the application for support.
Our landscape architects prepared the landscape master plan for the development application and the detailed design for operational works. Responding to Sunshine Coast Council’s Scenic Route requirements, the design features low-maintenance, region-specific landscaping, with native planting, landscape buffers and screening along the highway frontage, gateway treatments and water-sensitive design, alongside planting to streetscapes, drainage assets and internal areas around the industrial buildings.
This integrated engineering and landscape approach balanced commercial objectives, scenic route obligations and site servicing requirements to deliver compliant, development-ready industrial lots with high-quality presentation, therefore increasing industrial land supply and supporting regional employment and economic growth on the Sunshine Coast.













